How Much Concrete for a 12×12 Slab?

Quick Answer

For a 12×12 foot slab at standard 4-inch thickness, you need 1.78 cubic yards of concrete — approximately 80 bags of 80-lb mix or 107 bags of 60-lb mix.

  • 4 inches thick: 1.78 cubic yards = 80 bags (80 lb) or 107 bags (60 lb)
  • 5 inches thick: 2.22 cubic yards = 100 bags (80 lb) or 134 bags (60 lb)
  • 6 inches thick: 2.67 cubic yards = 120 bags (80 lb) or 160 bags (60 lb)
  • For 2+ cubic yards, consider ready-mix delivery — it is more cost-effective

Formula

Volume = (12 × 12 × Thickness ÷ 12) ÷ 27

Multiply 12 ft × 12 ft × thickness in inches, divide by 12 to convert to feet, then divide by 27 for cubic yards.

Step-by-Step Calculation

  1. 1

    Convert thickness to feet

    4 inches ÷ 12 = 0.333 feet

  2. 2

    Calculate cubic feet

    12 × 12 × 0.333 = 48 cubic feet

  3. 3

    Convert to cubic yards

    48 ÷ 27 = 1.78 cubic yards

  4. 4

    Calculate 80-lb bags

    48 ÷ 0.6 = 80 bags

12×12 Slab — Concrete by Thickness

ThicknessCubic Yards80-lb Bags60-lb BagsEst. Cost*
3 inches1.336080$260–$300
4 inches1.7880107$345–$400
5 inches2.22100134$435–$500
6 inches2.67120160$520–$600

*Cost based on $4.50–$5.00 per 80-lb bag. Ready-mix delivery at $120–$160/CY may be cheaper for 2+ yards.

Try the Concrete Calculator

Enter your exact dimensions for a precise, customized estimate.

Frequently Asked Questions

Should I use bags or ready-mix for a 12×12 slab?

At 1.78 cubic yards (4-inch thick), you are at the threshold. 80 bags is a lot of mixing. Ready-mix delivery ($120–$160/CY) is usually more convenient and produces a stronger, more consistent pour.

How thick should a 12×12 garage slab be?

Garage slabs should be 6 inches thick minimum with #4 rebar on 18-inch centers. This supports vehicle weight and provides adequate strength for long-term use.

How much does a 12×12 concrete slab cost installed?

Professionally installed, a 12×12 slab (144 sq ft) costs $800–$1,500 for a 4-inch thick slab or $1,200–$2,100 for 6-inch thick, including materials, labor, and finishing.