How Many Bricks for a 200 Square Foot Wall?
Quick Answer
A 200 square foot wall requires approximately 1,485 standard modular bricks (with 10% waste) and about 14 bags of pre-mixed mortar.
- Standard modular: 6.75 per sq ft → 1,350 + 10% = 1,485 bricks
- King-size bricks: 4.5 per sq ft → 990 bricks
- Mortar: ~14 bags of 80-lb pre-mixed mortar
- Total material cost: $800–$1,800 depending on brick type
Formula
Standard modular bricks with 3/8-inch mortar joints cover about 6.75 bricks per square foot. Multiply by wall area and add 10% for cuts and breakage.
Step-by-Step Calculation
- 1
Wall area
200 sq ft (e.g. 20 ft wide × 10 ft high)
- 2
Bricks needed (modular)
200 × 6.75 = 1,350 bricks
- 3
Add 10% waste
1,350 × 1.10 = 1,485 bricks
- 4
Mortar
200 ÷ 15 sq ft per bag = 13.3 → 14 bags
Brick Count by Type for 200 Sq Ft
| Brick Type | Size | Per Sq Ft | Needed (10% waste) | Cost* |
|---|---|---|---|---|
| Standard Modular | 3⅝×2¼×8" | 6.75 | 1,485 | $740–$1,485 |
| King Size | 3⅝×2¾×10" | 4.50 | 990 | $600–$1,200 |
| Queen Size | 3⅛×2¾×8" | 5.76 | 1,267 | $630–$1,270 |
| Concrete Block (8×16) | 8×8×16" | 1.125 | 248 | $300–$500 |
*Brick prices range from $0.50–$1.00 each for standard to $1.00–$2.50 for premium face brick.
Frequently Asked Questions
How much mortar for a 200 sq ft brick wall?
Plan on about 14 bags of 80-lb pre-mixed mortar — roughly 1 bag per 100 standard bricks. For 1,485 bricks, that is 14 to 15 bags.
How long to lay 200 sq ft of brick?
An experienced mason lays 400 to 500 bricks per day. A 200 sq ft wall (1,485 bricks) takes a skilled mason about 3 to 4 days. DIYers should plan for 7 to 10 days.
How much does a 200 sq ft brick wall cost installed?
Professional brick installation runs $10–$25 per square foot including materials and labor. A 200 sq ft wall costs $2,000–$5,000 fully installed.