Work out how many pavers you need for a patio, walkway or driveway, plus compacted base gravel, bedding sand, edge restraint, polymeric sand and material cost.

Written & reviewed by Michael FairUpdated June 2026Based on U.S. codes & pricingHow we calculate

How Many Pavers Do I Need? Paver, Base & Sand Calculator Guide

Concrete and clay pavers are the most popular way to build a patio, walkway or driveway that can flex with freeze-thaw cycles, be lifted and relaid for repairs, and look good for decades. A paver job is really three material orders: the pavers themselves, a compacted crushed-stone base that carries the load, and a thin layer of bedding sand that the pavers are set into. Most failed paver patios — sunken spots, rocking pavers, weeds pushing through — trace back to a base that was too thin or poorly compacted, not to the pavers.

The paver count comes from the face size. A 4" × 8" holland paver covers 32 square inches, so it takes 144 ÷ 32 = 4.5 pavers per square foot. A 6" × 9" takes 2.67, a 12" × 12" takes exactly 1 and a 24" × 24" slab takes 0.25. Many manufacturers quote nominal sizes that include a joint spacer, so their own sq ft per pallet figure is the most accurate when you have it. Add waste for cuts: about 5% for running bond, 10% for herringbone or basketweave, 12% for diagonal layouts and 15% where there are curves and circles.

Base depth depends on use. Patios and walkways get 4" of compacted crushed stone (crusher run, ABC or 3/4" minus) on well-drained soil and 6" on clay. Driveways get 8"–12" and should use the thicker 80 mm (3⅛") pavers. Order about 15% more base than the in-place volume, because loose stone compacts as you run a plate compactor over it. Bedding sand is a screeded 1" layer of coarse concrete sand — never fine play sand or stone dust under pavers in wet climates, since both hold water.

In 2026 US pricing, standard concrete pavers run about $3–$6 per sq ft at the yard, premium tumbled or permeable pavers $6–$12, and clay brick pavers $5–$10. Crushed base is roughly $35–$60 per ton delivered, concrete sand $30–$55 per ton, plastic edge restraint $2–$3 per foot and polymeric sand $30–$45 per 50 lb bag. Professionally installed paver patios typically land at $15–$30 per sq ft, with driveways and complex patterns at the top of that range.

The other quantities follow from the shape. Edge restraint runs the full perimeter wherever the pavers do not butt against a house or curb, and is spiked every 12". Excavation depth is base + sand + paver thickness — about 7.4" for a patio with 4" of base and standard 2⅜" pavers — which means a 12 × 16 ft patio produces more than 4 cubic yards of soil to haul away or spread elsewhere. Plan for that before the first shovel goes in.

How to Use This Calculator

1. Choose Imperial or Metric units. 2. Enter the length and width of the paved area. For L-shapes, split the area into rectangles and add the results. 3. Pick a paver size or enter a custom size. 4. Choose your laying pattern — it sets the waste allowance. 5. Choose Patio/Walkway (4" base) or Driveway (8" base). 6. Optionally enter paver price per sq ft and base gravel price per ton. 7. Click "Calculate" for pavers, base, sand, edging and cost. Tip: Buy all pavers from the same production lot so colors match across the whole job.

Understanding Your Result

The paver count already includes waste for your pattern, so it is the number to buy — round up to whole pallets or bundles if your supplier sells that way. Base tonnage includes 15% for compaction. If any number looks high, check the dimensions first: a typo in one side changes everything proportionally.

Key Formulas

Pavers per Square Foot

Pavers per sq ft = 144 ÷ (Paver length in × Paver width in)

Multiply by the area and then by (1 + waste) to get the number to buy.

Base Gravel

Base tons = Area × (Depth in ÷ 12) ÷ 27 × 1.15 × 1.4

1.15 adds 15% for compaction; 1.4 converts cubic yards of crushed stone to tons.

Bedding Sand

Sand cu yd = Area × (Sand depth in ÷ 12) ÷ 27

Multiply by about 1.35 for tons, or divide cubic feet by 0.5 for 50 lb bags.

Worked Example

A 12 × 16 ft backyard patio with 4" × 8" pavers in a herringbone pattern, 4" compacted base and 1" bedding sand.

  1. 1Area = 12 × 16 = 192 sq ft; perimeter = 2 × (12 + 16) = 56 ft
  2. 2Pavers = 192 × 4.5 = 864; + 10% herringbone waste = 950.4 → 951 pavers
  3. 3Base = 192 × (4 ÷ 12) ÷ 27 = 2.37 cu yd; × 1.15 compaction = 2.73 cu yd ≈ 3.82 tons
  4. 4Sand = 192 × (1 ÷ 12) = 16 cu ft = 0.59 cu yd ≈ 0.80 tons, or 34 × 50 lb bags with 5% extra
  5. 5Edge restraint = 56 ft (7 × 8 ft lengths); polymeric sand ≈ 192 ÷ 50 = 4 bags
  6. 6Excavation = 4" + 1" + 2.375" = 7.4" deep, about 4.37 cu yd of soil

Order 951 pavers, about 3.8 tons of crushed base, 0.8 tons of sand, 56 ft of edging and 4 bags of polymeric sand. At $4.50 per sq ft for pavers and $45 per ton for base, materials are roughly $1,120 before sand, edging and delivery.

Assumptions Behind This Estimate

  • Rectangular area — split L-shapes and add the results
  • Waste: 5% running bond, 10% herringbone, 12% diagonal, 15% curved layouts
  • Base: crushed stone at 1.4 tons per cu yd with 15% compaction allowance; 4" for patios, 8" for driveways
  • Bedding sand at 1.35 tons per cu yd; 50 lb bag = 0.5 cu ft
  • Polymeric sand at about 50 sq ft per bag (varies with joint width and paver size)
  • Excavation assumes standard 60 mm (2⅜") paver thickness

Pavers per Square Foot by Size

Number of pavers needed per sq ft and per 100 sq ft before waste.
Paver SizePavers per Sq FtPer 100 Sq FtWith 10% Waste
4" × 8"4.50450495
6" × 6"4.00400440
6" × 9"2.67267294
12" × 12"1.00100110
12" × 24"0.505055
16" × 16"0.565762
24" × 24"0.252528

Based on nominal face size. Use the manufacturer's sq ft per pallet when it differs.

Before You Buy: Practical Advice

  • Compact the base in 2–3" lifts with a plate compactor, lightly misting the stone so it locks together.
  • Screed the sand with 1" pipes as rails and never walk on the screeded bed — work from the pavers you have already laid.
  • Pull pavers from three or four pallets at once so color variations blend across the whole patio.
  • Run the plate compactor over the finished pavers (with a pad) before and after sweeping in joint sand to seat them.
  • Call 811 before you dig, and check whether your city requires a permit for driveways or for changing drainage.

Frequently Asked Questions

How many pavers do I need for a 12x12 patio?

A 12 × 12 ft patio is 144 sq ft. With 4" × 8" pavers at 4.5 per sq ft that is 648 pavers before waste, or about 713 with 10% added for a herringbone pattern. With 6" × 9" pavers it is 384 before waste and about 423 with 10%. With 12" × 12" pavers you need 144 plus waste, so about 152–159 depending on the pattern.

How much base gravel do I need under pavers?

For a patio, plan 4" of compacted crushed stone, which is about 1.23 cubic yards per 100 sq ft in place, or about 1.42 cubic yards ordered once you add 15% for compaction. At 1.4 tons per cubic yard that is roughly 2 tons per 100 sq ft. Driveways need about twice that because the base is 8" or more.

How much sand do I need for pavers?

A 1" bedding layer takes about 0.31 cubic yards per 100 sq ft, which is roughly 0.42 tons or 17–18 bags of 50 lb sand. Use coarse washed concrete sand. Joint sand is separate: polymeric sand typically covers 25–75 sq ft per 50 lb bag depending on paver size and joint width, so plan around 2 bags per 100 sq ft for brick-size pavers.

Are pavers cheaper than concrete?

Not up front. A plain broom-finish concrete patio usually costs $8–$15 per sq ft installed, while pavers run $15–$30. Pavers win on repairs and appearance: a cracked slab must be cut out and patched, while damaged pavers can be lifted and replaced individually. See our stamped concrete vs pavers guide for a full lifetime cost comparison.

Do I need edge restraint for pavers?

Yes, anywhere the pavers are not held by a wall, step or curb. Without edge restraint the outer rows creep outward and the joints open up within a season or two. Plastic or aluminum edging spiked every 12" into the base is standard for patios; driveways often use a concrete curb or a poured concrete toe along the edge.

How deep should I dig for a paver patio?

Add the base depth, the 1" sand layer and the paver thickness. For a patio with 4" of base and 2⅜" (60 mm) pavers, dig about 7½" below the finished surface. For a driveway with 8" of base and 3⅛" (80 mm) pavers, dig about 12½". Always set the finished height so the surface slopes about 1/4" per foot away from the house.